Completed Projects

  • Wright Park Bridge Replacement
    Demo and replacement of existing bridge over the pond and some ADA upgrades in the park.
    Status: Project is complete.
     
  • Swan Creek Property Acquisition
    Metro Parks is coordinating with Tacoma Housing Authority to purchase property next to Swan Creek Park for the purpose of providing more direct access to the park from Portland Avenue.
    Status: Project is complete.
     
  • STAR Center
    The scope of work includes HVAC improvements for the administration area, Tot Trek and Zip and Zoom.
    Status: Complete
     
  • PDZA Sea Lion Exhibit
    Design, permitting and construction of a sea lion exhibit where seals currently reside. This was former beluga whale exhibit.
    Status: Complete
     
  • PDZA Rocky Shores Underwater Viewing Window Improvements
    Remove eight existing windows and replace in-kind for puffin, otter, walrus and sea lion exhibit area. Included are new frames, bolts and sealants.
    Status: Complete
     
  • People’s Community Center Pool
    In partnership with the City of Tacoma, this project will rebuild and expand the pool at the center with a zero-depth entry, lazy river, water play zone, party rooms and more.
    Status: Project complete
     
  • Fort Nisqually Capital Development Plan and Program Plan
    The plans will help define the Fort’s long-term capital needs and identify program opportunities to advance the vision and mission.
    Status: 1/30/17 Project complete
     
  • Marina Lighting
    Replacement of light poles in the Marina parking area.
    Status: 3/15/17 Project complete
     
  • Point Defiance Zoo & Aquarium Jellyfish Gallery
    Construction of a new jellyfish exhibit.
    Status: 1/30/17 Project complete
  • Point Defiance Zoo & Aquarium Walrus Pool Upgrades
    Test exhibit for delamination and structural integrity and make necessary repairs. Cover existing shotcrete with a new coat consisting of a mix without rocks.
    Status: 1/30/17 Project complete
     
  • NW Trek - Kids’ Trek
    Construction of a half-acre, nature-themed play area.
    Status: 1/30/17 Project complete
     
  • NW Trek - Animal Facility Upgrades
    Electrical and other upgrades.
    Status: 1/30/17 Project complete
     
  • NW Trek Infrastructure Upgrades
    Upgrade shake roofs, and 3 tab roofs, electrical upgrades, concrete curbs and upgrading domestic water with meters.
    Status: 1/30/17 Project complete
  • NW Trek Off-Exhibit Animal Housing
    Design and construct animal enclosures in the parks Animal Health Care Zone.
    Status: 3/15/17 Project complete

  • NW Trek - New Pedestrian Bridge
    Design and construction of a new pedestrian bridge to improve the visitor experience.
    Status: 3/15/17 Project complete

  • Vassault Soil Remediation
    The Department of Ecology led remediation of contaminated soil in the lower ballfields.
    Status: 1/30/17 Project complete
  • Optimist Soil Remediation
    This is another Department of Ecology remediation project.
    Status: 1/30/17 Project complete
  • Baltimore Soil Remediation
    This is another Department of Ecology remediation project.
    Status: 1/30/17 Project complete 
     
  • Vassault Park Irrigation Pump
    The purchase and installation of a new centrifugal pump and installation of irrigation materials to improve coverage of several zones.
    Status: 1/30/17 Project complete
     
  • Wright Park Arboretum
    The Wright Park arboretum will undergo improvements as new tree signage will be installed and related programming materials are developed.
    Status: 1/30/17 Project complete
  • Swan Creek Park Phase I
    Several upgrades, including a 20-stall parking lot near the existing community garden and new park entrances.
    Status: 1/30/17 Project complete
     
  • Swan Creek Mountain Bike Trails II
    Additional trails to the mountain bike course. Evergreen Mountain Bike Alliance is performing design and leading volunteer construction efforts.
    Status: 1/30/17 Project complete
  • Stewart Heights Pool Water Play Upgrade
    A new water toy was installed to replace the old one.
    Status: 1/30/17 Project complete
     
  • McKinley Park Pond
    Upgrades to the pond wall, sealing the wall for water leakage and installing a liner behind the wall
    Status: 1/30/17 Project complete
     
  • Multipurpose Field at SERA Campus
    New synthetic field, lighting and parking.
    Status: 1/30/17 Project complete
     
  • Wapato Hills Trail Improvements
    New master plan. New and upgraded trails, signage and trailheads
    Status:  1/30/17 Project complete
     
  • SERA Athletic Complex Lighting
    Remove existing lights from two fields and replace them with new LED lights and poles
    Status:1/30/17 Project complete
     
  • Puget Creek Boardwalk
    A new boardwalk will be constructed through the lower wetland area, in cooperation with the Puget Creek Restoration Society.
    Status: 1/30/17 Project complete
Alderwood Park Bond Funding: $350,000
Completed Projects 2007: Design Study Report 
Completed Projects 2009: Provided additional lighting to improve site security, an irrigated picnic lawn area adjacent to the playground, trail upgrades with better surfacing and adjacent clearing, enlarged playground, and new signage.
Alling Park Bond Funding: $390,000 / Additional Funding: $46,272
Completed Projects 2007: Design Study Report
Completed Projects 2009: Demolition of existing shelter building, wading pool, half of the tennis court; installation of new playground purchased by South End Neighborhood Council; new site furnishings; re-grading site to manage storm run-off; improve open play areas and new walking path; development of bio-swales with City Storm Water Management Division; reforestation of entire site; and pathway upgrades for walking loop trail. Fire destroyed the first new playground, and another new playground was purchased and installed.
Baltimore Park Bond Funding: $150,000
Completed Projects 2007: Design Study Report 
Completed Projects 2010:
new play structure, upgraded entry fencing, walking trail improvements, expanded soccer field, irrigation upgrades
Browns Point Athletic Complex Bond Funding: $2 million partnership funds
Completed Projects 2011: ugrades to athletic fields for Little League baseball and soccer field complex at Browns Point Elementary School
Tacoma School District is now maintaining this property
Browns Point LIghthouse Park Bond Funding: $500,000 / Additional Funding: $10,000
Completed Projects 2008: garage removed and area graveled and turned into temporary parking lot
Completed Projects 2011: Chimney restored and windows restored and replaced. Removed the small, non-essential garage which improved open space, eliminated maintenance costs and added parking space. Replaced deteriorated roofs on the Keeper's cottage, history center, boathouse and bellhouse with new cedar shakes.
Browns Point Playfield Bond Funding: $250,000
Completed Projects 2008: replaced tennis court fencing, installed new play equipment, rebuilt parking lot and curbing, upgraded irrigation, turf improvements
Charlotte's Blueberry Park Bond Funding: $300,000 / Additional Funding: $26,935
Completed Projects 2008: created paved walking trail, installed low fencing to provide vehicle barrier along D Street, constructed ADA accessible entry off D street, installed new interpretive sign
Completed Projects 2012: installed ADA parking stall at the entry, installed pad/enclosure for portable toilet, converted existing litter receptacles to maxi-cans, installed ADA compliant benches
Cloverdale Park Bond Funding: $225,000 / Additional Funding: $350,000
Completed Projects 2012: removed restroom, replaced tennis court with basketball court, renovated picnic shelter, improved irrigation.
Dash Point Park Bond Funding: $275,000 / Additional Funding: $15,000
Completed Projects 2011: Installed new ship-themed Big Toys play equipment, upgraded restroom, renovated fountain
Eastside Pool Bond Funding: $500,000
Completed Projects 2007: replaced swimming pool water heating boiler
Completed Projects 2008: installed through-wall exhaust fan in spa room
Completed Projects 2009: renovated pool drain
Completed Projects 2013: interior tile, lobby carpet, paint and replacement of some building fixtures and equipment / dressing room carpeting, tile, paint, lighting and ventilation
Fern Hill Park Bond Funding: $150,000
Completed Projects 2011: installed dynamic new playground, renovated pathways, made turf improvements, upgraded utilities / in addition, neighbors have adopted the park, maintaining multiple flowerbeds of native and ornamental plants.
Ferry Park Bond Funding: $125,000 / Additional Funding: $20,000
Completed Projects 2009: installed new ornamental steel fence, replaced damaged sidewalks, installed new play equipment and two new picnic tables and eight park benches, installed small seating wall/benches constructed from concrete rubble salvaged from the sidewalk demolition near the children's play area and the kiosk, relocated existing park sign, installed additional message board labeled "Tacoma's first Park"
Fort Nisqually Living History Museum Bond Funding: $1.25 million / Additional Funding: $562,019
Completed Projects 2009: Interpretive Center, Education Building and improved artifact storage
Franklin Park Bond Funding: $1.1 million / Additional Funding: $500,000
Completed Projects 2009: created master concept plan
Completed Projects 2010: installed new KOMPAN playground equipment, sidewalks and curbs
Completed Projects 2013: new sprayground, community garden improvements, trails and walkways, plaza space and picnic shelter
Garfield Park Bond Funding: $375,000 / Additional Funding: $237,431
Completed Projects 2007: Design Study Report
Completed Projects 2008: KOMPAN donated and installed ten new pieces of equipment and replaced the sand based safety surfacing with Fibar Woodcarpet
Completed Projects 2010: KOMPAN added two fitness areas to the playground equipment - Core Circuit Stations along the running track for cardio-core cross training and an X-Ercise Zone cluster of fitness equipment designed for stretching and dynamic movement for seniors
Completed Projects 2011: resurfaced basketball court, replaced standards, new soccer field, baseball backstop, improved field drainage, re-designed entry area, re-graveled pathway, fencing, native landscaping, site furnishings
Harmon Park Bond Funding: $200,000 / some funding used for Baker Middle School Playground improvements / remaining funding moved to unallocated to use on other bond projects 
Park is Closed
Heidelberg Davis Park Bond Funding: $500,000
Current Projects 2014: new concession-entry building, new play area
Irving Park Bond Funding: $200,000
Completed Projects 2012: wading pool and restroom building were removed; fencing was replaced along south 25th Street and the basketball court was repaved
Jane Clark Park Bond Funding: $200,000
Completed Projects 2010: barrier free access, benches and picnic tables and new play equipment.
Completed Projects 2011: reforestation work completed to replace 13 declining Lombardy poplars with a healthier, sturdier species
Jefferson Park Bond Funding: $525,000 / Additional Funding: $69,311 
Completed Projects 2006: new playground equipment installed
Completed Projects 2007: new sprayground installed
Completed Projects 2008: reforestation was completed with 12-15 trees planted in the vicinity of the new playground and sprayground
Kandle Park Bond Funding: $450,000 / Additional Funding: $674,611 / $6 million for Titlow pool replacement
Completed Projects 2009: Kandle Park & Pool Master Plan 
Completed Projects 2012: irrigation throughout the park, extensive landscaping, walking trails, a new playground, skate dots, mini-sprayground, additional parking, 7,500 sf zero-depth wave pool, four 25 meter lap lanes, spray toys, separate spraypool, support buildings
Completed Projects 2013: ADA improvements to the pool including installation of pool bars for accessible access
Lincoln Park Bond Funding: $500,000 / Additional Funding $40,780
Completed Projects 2007: Design Study Report
Completed Projects 2009: new play equipment, lighting, water main, restroom renovation/old restroom building removed, tree planting, and landscaping and pathway renovation
Lots for Tots Bond Funding: $125,000
Completed Projects 2008: new play equipment, new site furnishings
Manitou Park Bond Funding: $850,000
Completed Projects 2011: Design Development Plan
Completed Projects 2012: playground upgrades, access, fencing, picnic shelter, site furnishings, new water line, security lighting, replace barrier wall, and pave parking area 
McCarver Park Bond Funding: $175,000 / Additional Funding: $628,664
Completed Projects 2010: new play equipment, spray ground, signage, landscape improvements and irrigation upgrades
McKinley Park Bond Funding: $1.665 million / Additional Funding: $1.512 million
Completed Projects 2009: skate spots and dots, playground, pond restoration, turf, irrigation, utilities, planting & paving, new restrooms, new entrance and promenade, off-leash demonstration area
Current Project 2014: trail & way finding signage
McKinley Playfield Bond Funding: $550,000 / Additionaol Funding: $207,939
Completed Projects 2006: new playground equipment
Completed Projects 2007: new sprayground, picnic tables, site furnishings, landscaping, field renovation
Completed Projects 2008: reforestation with the old poplar trees on the perimeter replaced with 20 new trees
Neighbors' Park Bond Funding: $50,000 / Additional Funding: $47,706
Completed Projects 2006: playground equipment replaced and new swing installed with a concrete curb enclosure, plantings and hardscape
Completed Projects 2007: community garden renovated, new park identification sign installed, section of the timber retaining wall and brick walkway reconstructed with new matching concrete wall and pavers reset on a gravel base
Norpoint Park Bond Funding: $1.5 million / Additional Funding: $13,351
Completed Projects 2008: Concept Plan
Completed Projects 2011: new playground, sprayground, landscaping (including rain gardens and eco-turf), furnishings, skate park, trail elements, parking lot repair and resurface, restroom with eco-friendly green roof
Norpoint Center Bond Brochure: $2.755 million / Additional Funding: $29,844
Completed Projects 2007: climbing wall, readerboard sign
Completed Projects 2009: building and pool improvements
Completed Projects 2013: new mechanical plant and ADA improvements to the pool including addition of a pool lift and transfer bars for accessible access to spa/bubble pool
North Slope Historic District Park Bond Funding: $25,000
Completed Projects 2009: power upgrades including addition of electrical service, site lighting fixtures, 20 Amp convenience outlet circuit, automatic sprinkler irrigation system powered, and secure and tamper proof electrical cabinet to house the meter base, circuit panel and electrical outlets
Northeast Tacoma Playground Bond Funding: $250,000
Completed Projects 2008: new 4' high perimeter fence, wading pool removed, children's play area replaced, Maxi-Can litter receptacles, irrigation system for the north part of the site, park entry sign, repaired basketball court, screen portable toilet units, picnic tables and benches, trees and improvements made to fencing and backstops at baseball field and manual infield irrigation system
Northwest Trek Wildlife Park Bond Funding: $2 million / Additional Funding: $46,544
Completed Projects 2007: roof replacement at Tram Barn, Lean-to, Hay Barn, Veterinary Clinic, and Maintenance Shop / new HVAC Systems installed in the main office complex incorporating a high SEER (Seasonal Energy Efficiency Ration) rating to optimize efficiency / asphalt pavement replacement and upgrade of roadways and pathways throughout the park
Completed Projects 2008: design of a park-wide Conceptual Utility Upgrade Concept Plan, an Overall Architectural Concept Plan and Site Specific Architectural Concept Plans
Completed Projects 2009: three 1974 trams units were renovated
Completed Projects 2010: Cheney Discovery Center roof replacement
Oakland/Madrona Park Bond Funding: $125,000 / Additional Funding: $40,427
Completed Projects 2011: Design Development Plan  
Completed Projects 2012: active playground feature and general site upgrades including new site furnishings, a spinner play feature suitable for 2-5 year olds, upgraded accessible pathways and parking stall
Current Project 2014: demolition of the field house / replacement shelter and other minor site improvements including removal or filling of an underground oil tank, minor irrigation upgrades and entry/parking upgrades
Oak Tree Park Bond Funding: $400,000
Completed Projects 2007: Oak Tree Park Design Study Report 
Current Project 2014: trails & signage
Current Project 2014: landscaping and new play equipment. Metro Parks is also working with the City of Tacoma to help develop the segment of the Water Ditch Trail adjacent to Oak Tree Park
Old Town Park Bond Funding: $250,000 / Additional Funding: $70,000
Completed Projects 2009: Old Town Park Design Plan
Completed Projects 2010: new playground, half basketball court, walkways and site furniture
Completed Projects 2012: shelter building, new irrigation and drainage system
Optimist Park Bond Funding: $300,000
Completed Projects 2010: new play equipment, basketball court, backstop, picnic table, bench, park sign, bollards, landscaping
Peck Field Bond Funding: $500,000
Bond Brochure: drainage system and restroom-concession renovation
Peoples Park Bond Funding: $300,000
Completed Projects 2012: perimeter sidewalk repairs, decorative fencing, picnic tables and benches, irrigation upgrades, trees, landscape improvements, new stage at the lower end of the park, relocation of the play area and basketball court.
Peoples Center Bond Funding: $1.5 million
Completed Projects 2011: general upgrades to center
Current Projects 2014: The Board of Park Commissioners passed a resolution to allocate $1.65 million to support the City's replacement of People's Pool.
Point Defiance Park Bond Funding: $5.5 million
Completed Projects 2007: Master Plan
Completed Projects 2012: upgrade to irrigation main replacing nearly 7,000 lineal feet of main line, 18 water meters (deducts) installed on existing water systems to allow MPT to monitor water consumption
Completed Project 2013: Pagoda repaired after April 15, 2011 arson fire and significant structural improvements made including new spaces for classes, meetings and celebrations created on the lower floor
Current Project 2014: trail linking Point Defiance Park and the waterfront
Current Project 2014: Water Main
Point Defiance Zoo & Aquarium Bond Funding: $2 million / Additional Funding: $2.284 million
Completed Projects 2009: Kids' Zone (Phase Two)
Portland Ave. Park & Center Bond Funding: $1.15 million / Additional Funding: $29,991
Completed Projects 2007: Design Study Report
Completed Projects 2009: sports field drainage was improved and wading pool drain grates installed
Completed Projects 2010: new landscaping and two new uni-sex restrooms were built / the building received roofing, exterior cladding, lighting, floor coverings and improvements to the entry vestibule (ADA accessible) and restrooms (ADA accessible).
Proctor Gardens Completed Projects 2013: new fence & gates installed
Puget Park Bond Funding: $275,000
Completed Projects 2007: replaced play equipment, upgraded irrigation and made access improvements / cherry trees lining Proctor Street replaced with hybrid flowering dogwood trees
Current Project 2014: trail & way finding signage
Roosevelt Park Bond Funding: $50,000
Bond Brochure: walking trail upgrades and new fencing
Completed Projects 2011: walking trail upgrades, fencing, maxi-can, irrigation repairs, backstop repairs, trees, and turf field and vegetation improvements for improved visibility
Ruston Way Bond Funding: $5.5 million / Additional Funding: $1 million
Bond Brochure: matching funds for promenade extension through Asarco site to Point Defiance Park, rip-rap restoration, new irrigation systems, new site lighting and furnishings, upgrade of site utilities, and restroom and concession renovations
Completed Projects 2008: renovation of planting beds, rebuilding some retaining walls, and some irrigation changes at Jack Hyde Park; contributed along with COT & FWDA to new ADA gangway and landing float to Thea's Park
Completed Projects 2013: reconstruction of Old Town Dock
Current Projects 2014: new restroom at Old Town Dock
Ryan's Park
(prev. Celebration Park)
Bond Funding: $250,000
Competed Projects 2007: new playground equipment
Completed Projects 2012: approximately 1 acre of turf was transitioned to mulch and native plants
Sawyer Tot Lot Bond Funding: $190,000
Completed Projects 2008: new playground equipment, basketball court improvements and installation of park sign, fencing, benches, tables and maxi-can
South End Neighborhood Center Bond Funding: $500,000 / funding moved to STAR Center projects
Operations reverted to the City of Tacoma at the end of 2011.
South End Recreation Area Bond Funding: $750,000
Completed Projects 2008: two fields were converted from softball to baseball 
Current Projects 2014: sprayground and playground / in addition, a park restroom building is incuded and a 2 acre event lawn will be developed to support large community events and the local farmer's market / a future phase will include the construction of a multi-purpose shelter building
Current Project 2014: SERA Campus Master Plan
South Park & Center Bond Funding: $1.7 million / Additional Funding: $254,294
Completed Project 2006: new playground equipment installed
Completed Projects 2007: new sprayground installed as well as irrigation system,site furnishings, parking lot upgrades and restroom remodel
Completed Project 2009: South Park Water Ditch Trail Project
Completed Projects 2011: general enhancements and upgrades to the center
Stanley Playfield Bond Funding: $75,000 / Additional Funding: $3,232
Completed Projects 2006: perimeter chain link fencing removed and replaced with a vinyl clad chain link system fence, new security gates, cone baseball backstop replaced with a three-panel chain link backstop, basketball standard replaced, and new entry sign installed
Completed Project 2007: tennis court paving removed
STAR Center Bond Funding: $5 million partnership funds for replacement of Manitou Community Center / Additional Funding: $2.845 million
Completed Project 2012: 32,000 square foot LEED Silver building includes rental hall, music and dance studio, demonstration kitchen, fitness room, and dynamic indoor/outdoor children's playground with an adjacent party rental space
Stewart Heights Park & Pool Bond Funding: $2.25 million
Completed Project 2007: development plan
Completed Projects 2010: new play equipment, expanded irrigation, fencing, field improvements for baseball and soccer, skate park update, restroom, renovated parking and entry drives, new perimeter walking trail, and new picnic area
Completed Projects 2013: ADA improvements to the pool including addition of a pool lift, pool bars for accessible access, and transfer bars for accessible access to spa/bubble pool.
Swan Creek Bond Funding: $1 million
Completed Project 2011: Swan Creek Master Plan 
Completed Project 2012: Community Garden including reactivation of irrigation, re-construction of irrigation hydrants, modifications to existing garden shed, installation of chain link perimeter garden fence
Current Projects 2014: trail improvements, Evergreen Mountain bike trails, E. 56th St. improvements, greenspace habitat restoration & forest management
Tacoma Nature Center Bond Funding: $1.4 million / Additional Funding: $9.15 million
Completed Projects 2006: demolition of house, Babcock property acquisition
Completed Project 2007: pedestrian bridge improvements
Completed Projects 2009: physical plan update, interpretive signage, fencing, barrier free access improvements
Completed Projects 2010: general building improvements, Kahlhagen House demolition, Children's Discovery Area
Completed Projects 2011: interior exhibits
Titlow Park Bond Funding: $3 million / Additional Funding: $752,548
Completed Project 2010: Master Plan 
Completed Projects 2010: BNSF railroad fence, reforestation, feasibility study for Titlow Lagoon restoration & fish passage
Completed Projects 2011: Titlow Lodge improvements, North Lagoon trail enhancement & habitat restoration
Completed Projects 2013: installed playground & sprayground, removed Titlow Pool
Current Project 2014: trail & way finding signage
Ursich Park Bond Funding: $25,000
Completed Project 2010: trail renovation
Vassault Park Bond Funding: $600,000
Completed Project 2007: Design Study Report
Completed Projects 2009: upgraded turf irrigation and drainage for soccer fields, new gates and fencing, new backstops and dugouts, new restroom and storage area, and parking lot lighting installed
Completed Project 2013: installed upgraded play equipment
Current Project 2014: underdrainage enhancements (being done in conjunction with DOE soil remediation)
Wapato Hills Park Bond Funding: $200,000
Current Project 2014: Vegetation Management, Habitat Management, Environment Management, Active Use/Recreation-Future Usage, Safety Planning - This is a City of Tacoma and Metro Parks Tacoma Partnership.
Wapato Park Bond Funding: $2 million / Additional Funding: $1.817 million
Completed Projects 2012: three phases of improvements, including a new loop trail around the lake, new dog park, restroom facilities, renovations to the historic pavilion, and lake water quality improvements
Wright Park Bond Funding: $4 million / Additional Funding: $1.277 million
Completed Project 2005: Wright Park Master Plan / Primary Features of the Final Plan / Schematic of final proposed layout for Wright Park
Completed Projects 2008 - Phase I improvements created a longer view of the park and featured design elements that improve safety and security: the south entry and bowling green, north entry, renovation of the maintenance building, relocation of the basketball court and renovation of the pond.
Completed Projects 2011 - Phase II improvements included a new playground and sprayground, landscaping, bike racks, picnic tables, benches, trash receptacles, a water fountain and four interpretive/way finding signs. The old restroom and playground were removed to create a new outdoor performance area and pathway.


OTHER FUNDED IMPROVEMENTS

Athletic Field Upgrades/Conversions Bond Funding: $1 million
Bond Brochure: improvement of baseball-softball practice fields and realignment to meet soccer needs throughout district
Environment, Greenspace and Natural Area Enhancements Bond Funding: $1 million
Bond Brochure: environmental cleanup, nature education opportunities, and native habitat restoration
Land Acquisition and Development Program Bond Funding: $1 million
Bond Brochure: funds for park and open space acquisition and development (Snake Lake, Foss Waterway, Swan Creek)
Off-Leash Park Development Bond Funding: $175,000
Bond Brochure: creation of a central community facility
Recreation Facilities Contributions Bond Funding: $5 million
Bond Brochure: expansion of classroom, gymnasium, art center & field facilities in partnership with Schools, Boys & Girls Club and City
Reforestation Bond Funding: $300,000
Bond Brochure: tree planting program throughout the parks
Skate Board Parks Bond Funding: $750,000
Bond Brochure: provide facilities throughout the community
Trail Improvement Program Bond Funding: $300,000
Bond Brochure: pedestrian and bicycle expansion and improvements for Flume Line/Water Ditch, West End Trails and other trails


OTHER

Existing Debt Refinancing Bond Funding: $7.5 million